Design-Build with ICC

Miramar was a design-build project by ICR and ICC starting with conditions assessment and testing by ICR followed by implementation by ICC.

Read More

Exterior Facade Conservation and Repair
• Conditions survey
• Creation of AutoCAD drawings
• Design & execution of laboratory & in-situ testing programs
• Implementation of cleaning sculptural compenents
• Consolidation testing on limestone in laboratory
• Development of conservation repair methods & materials
• Quality control of conservation scope of work with ICC

ICR was given the task of developing a conservation program for the exterior limestone of this private residence.  ICR was involved in the entire restoration process—from the design of the scope of work to its implementation along with ICC. ICR designed and implemented a testing program to develop the methods and materials for the building’s conservation.  Laboratory testing included advanced analysis of materials, mortar analysis and consolidation testing on the limestone. One major factor of decay was salt in the masonry which had to be tested in situ for its removal and subsequent reaction with consolidants. The salts were causing discoloration and erosion to the limestone but with no relief from salt exposure due to its oceanfront loction. The efficacy of the consolidants was evaluated by measuring alterations in water vapor transmission rates, color, and indirect tensile strength.  In-situ tests included non-destructive cleaning tests, consolidation testing, and repair mock-ups. 

Implementation and construction administration has been conducted by both ICR and ICC on the main house and landscape statues, fountains, and outbuildings.